Brazilian nuclear power plant Angra 1 approved for 20-year life extension
November 26, 2024

Brazilian nuclear power plant Angra 1 approved for 20-year life extension

Unit 1 of Angra nuclear power plant, which is managed by Brazilian energy company Eletronuclear, has been authorised by the country's National Nuclear Energy Commission to operate to 2044. This will extend its operating time to 60 years.

Brazilian nuclear power plant Angra 1 approved for 20-year life extension
Angra Nuclear Power Plant (Photo: World Nuclear News)

Angra 1, a 640 MWe Westinghouse pressurized water reactor, reached criticality in 1982 and began commercial operations in 1985. Alongside Angra 2 (1,275 MWe, operational since 2001), the plant is a cornerstone of Brazil’s nuclear energy program. The license renewal process, initiated in 2019, involved thorough technical evaluations, International Atomic Energy Agency (IAEA) missions, and an Integrated Implementation Plan for Safety Improvements.

The license renewal process involved thorough technical evaluations, IAEA missions and an Integrated Implementation Plan for Safety Improvements

The Fukushima Response Plan and the Local Emergency Plan have bolstered the plant's safety measures. Angra 1 has maintained an impressive 88.24% load factor over the past five years, producing 4.78 million MWh in 2023—enough to power a city of two million people. The renewal is hailed as a milestone for Brazil’s regulatory system and energy sector, with a commitment to conduct a Periodic Safety Reassessment in 2033 to ensure continued adherence to international safety standards.

Over the past five years, Angra 1 has maintained enough load factor to power a city of two million people

Source: World Nuclear News

  • This field is for validation purposes and should be left unchanged.
  • Newsletter

    Subscribe to our newsletter and we will keep you up to date with the latest news in the nuclear field.